Upper and lower plates 3 must rest completely on not deformable surfaces. To ensure the stability of the structure, the system designer must predict any further precaution against side shifts and anti-tilt in function of: knocks and vibrations, wind effect, seismic conditions and hardness of support structure. for DOUBLE SHEAR BEAM load cells (DTL): Install the weighed system using only the mounting kit without the load cell 1 and inserting in its place a piece of pipe (Ø40x220 mm): unscrewing the nuts 5 and take off one of the two stay rods 4 and the plate 2 . To finish the installation (weldings, etc..), take off the piece of pipe and the plate 2 ; to place the plate 2 on the load cell 1 and insert them in mounting kit. Fix the load cell and the plate by using the bolts provided. Connect lower and upper plates 3 to the earthing system 9 then loosen nuts 6 ; verify that the threaded bar 8 slides into the hole; turn anti-tilt nuts 7 to a distance of 1 mm from plate. For further details visit www.laumas.com
Trustpilot
3 weeks ago
2 months ago